Re-setting the Standard

06th October 2017

Even on routine cut and pull operations, TRIDENT is saving time and money!  Read our latest TRIDENT case study including operating sequence and time savings.

TRIDENT® Anchor and Packer delivers a 23% efficiency gain on routine Cut & Pull operation.

THE OPERATION:

The TRIDENT Single-Trip casing recovery system was deployed on a Semi-Submersible rig in the North Sea, to perform a routine cut and pull operation on 9-5/8” x 10-3/4” casing. The operation could have been conducted with conventional equipment in two runs, but the TRIDENT System’s integrated and upgraded packer and anchor performed in a single trip, saving significant rig time even on this routine operation.

Read the full case study here.