Ardyne were approached by a Norwegian O&G Operator in 2020 to tender for a PP&A campaign which included 21 annular safety valve (ASV) retrievals.
A newly designed spear to set in 5 1/2" was proposed to be developed to address the operational challenges. The Ardyne Back Off Spear was designed, built, tested and offshore in 3 1/2 months, as of February 2021 it has been deployed on 2 successful recovery operations.
Click below to view the case study: