Major Operator eliminates 3 trips and saves 58 hours by utilising TRIDENT System

28th August 2019

TRIDENT System eliminates 3 trips and saves 58 hours on Gulf of Mexico deepwater slot recovery operation, our case study details the operation and shows how the Ardyne operation removed the unnecessary trips.

 

For further information or to speak to one of our team Contact Us