Conductor Cutting & Recovery from HWU

17th January 2024

Ardyne's TRIDENT FB System was deployed on an ageing asset from a HWU (Hydraulic Workover Unit) for the cut and recovery of 14 conductors. A follow on from a well abandonment campaign to cut and recover the inner strings.

The aged infrastructure was damaged, corroded & parted and with FB's track record of delivering faster, more reliable cuts alongside the superior FB Anchor it was the obvious choice for this type of operations.

 

To find out more on the campaign please read our most recent case study.

TRIDENT FB Case Study